E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Station-Cum-S&T building, gate lodges, PF sheds, Foot Over Bridge, Passenger Platforms, Station approach roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulating area Construction and fixing of various sectional boards and other allied and misc. works between Sagauli (inc.) to Bettiah (inc.) in c/w SGL-NKE doubling project under Dy.CE/Con/BTH in SPJ Div.
Estimate Cost
₹21.64 Cr
Sanctioned estimate
Tendered Cost
₹24.83 Cr
+14.7% vs estimate
Physical Progress
99%
Work completed
Status
Overdue
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsE-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Station-Cum-S&T building, gate lodges, PF sheds, Foot Over Bridge, Passenger Platforms, Station approach roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulating area Construction and fixing of various sectional boards and other allied and misc. works between Sagauli (inc.) to Bettiah (inc.) in c/w SGL-NKE doubling project under Dy.CE/Con/BTH in SPJ Div. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Durga Construction. The tendered cost of the work is ₹24.83 Cr, and it is currently Overdue with physical progress recorded at 99%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
DOC under process
Frequently Asked Questions
- QWhat is the current status of the railway work "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Sta"?
- Status: Overdue. This East Central Railway work is being executed by Durga Construction. Physical progress stands at 99%. Current date of completion (DOC): 31-03-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Durga Construction, 2A, Sneh Plaza Sardar Patel Path, North S.K. Puri Patna. Acceptance / agreement reference: ECR/CAO/Con/WT/Agt./108/ dated. 30.06.2020.. Work started on 18-02-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of" is ₹24.83 Cr (against an estimate of ₹21.64 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of" is one of hundreds of railway works covered.