East Central RailwayFinal Bill / Closure

E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Station-Cum-S&T building, gate lodges, PF sheds, Foot Over Bridge, Passenger Platforms, Station approach roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulating area, Construction and fixing of various sectional boards and other allied and misc. works between Sagauli (inc.) to Bettiah (inc.) in c/w SGL-NKE doubling project under Dy.CE/Con/BTH in SPJ Div.

Work #299
As of June 2026

Estimate Cost

₹21.64 Cr

Sanctioned estimate

Tendered Cost

₹24.83 Cr

+14.7% vs estimate

Physical Progress

100%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹24.83 Cr
Progress100%
Started18-02-2020
Target DOC30-07-2026
Sri Indrajit Kumar, CE/C/NW; Sri Ajay Kumar, Dy.CE/C/BTH; Sri Nirmal Shalhata, AEN/Con/II/BTH

Work Details

5 Fields
Work No.
299
Agency
Durga Construction
2A, Sneh Plaza, Sardar Patel Path, North S.K. Puri, Patna
Acceptance / LOA
ECR/CAO/Con/WT/Agt./108/ dated. 30.06.2020.
Officer in Charge
Sri Indrajit Kumar, CE/C/NW; Sri Ajay Kumar, Dy.CE/C/BTH; Sri Nirmal Shalhata, AEN/Con/II/BTH
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹21.64 Cr
Tendered Cost
₹24.83 Cr
Physical Progress
100%
Date Started
18-02-2020
Original DOC
17-08-2021
Extended DOC
30-07-2026

E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Station-Cum-S&T building, gate lodges, PF sheds, Foot Over Bridge, Passenger Platforms, Station approach roads, Level crossing roads, Supply and fixing of lifting barriers, yard drain, circulating area, Construction and fixing of various sectional boards and other allied and misc. works between Sagauli (inc.) to Bettiah (inc.) in c/w SGL-NKE doubling project under Dy.CE/Con/BTH in SPJ Div. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Durga Construction. The tendered cost of the work is ₹24.83 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

progress note: 100% (Work physically completed. Final bill under process.)

?

Frequently Asked Questions

QWhat is the current status of the railway work "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of Construction of Sta"?
Status: Final Bill / Closure. This East Central Railway work is being executed by Durga Construction. Physical progress stands at 100%. Current date of completion (DOC): 30-07-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Durga Construction, 2A, Sneh Plaza, Sardar Patel Path, North S.K. Puri, Patna. Acceptance / agreement reference: ECR/CAO/Con/WT/Agt./108/ dated. 30.06.2020.. Work started on 18-02-2020.
QWhat is the cost of this railway work?
The tendered cost of "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of" is ₹24.83 Cr (against an estimate of ₹21.64 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "E-Tender no. ECR-CAO-Con-N-E-tender-47-19-20 for the work of" is one of hundreds of railway works covered.