East Central RailwayIn Progress

Earth Work & Blanketing for Railway Formation work, Minor bridges, 03 No Composite girder bridges of 12.2m span each, One No 3.0m wide Foot Over Bridge Extension, Passenger Platform, Yard drains, Retaining wall, Staff quarters etc between Barauni and Bachhwara stations in connection with 3rd & 4th line work of Barauni-Bachhwara section of Sonepur Division of E.C.Railway.

Work #195
As of June 2026

Estimate Cost

₹154.02 Cr

Sanctioned estimate

Tendered Cost

₹130.22 Cr

-15.5% vs estimate

Physical Progress

35%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹130.22 Cr
Progress35%
Started12-06-2023
Target DOC28-02-2027
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ

Work Details

5 Fields
Work No.
195
Acceptance / LOA
01238810092252 dt. 02.12.2023
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Avinash Sahani, Dy.CE/C/II/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹154.02 Cr
Tendered Cost
₹130.22 Cr
Physical Progress
35%
Date Started
12-06-2023
Original DOC
28-02-2027
Extended DOC
N/A

Earth Work & Blanketing for Railway Formation work, Minor bridges, 03 No Composite girder bridges of 12.2m span each, One No 3.0m wide Foot Over Bridge Extension, Passenger Platform, Yard drains, Retaining wall, Staff quarters etc between Barauni and Bachhwara stations in connection with 3rd & 4th line work of Barauni-Bachhwara section of Sonepur Division of E.C.Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Jyoti Infra JV-Patna. The tendered cost of the work is ₹130.22 Cr, and it is currently In Progress with physical progress recorded at 35%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earth Work & Blanketing for Railway Formation work, Minor bridges, 03 No Composi"?
Status: In Progress. This East Central Railway work is being executed by M/s Jyoti Infra JV-Patna. Physical progress stands at 35%. Current date of completion (DOC): 28-02-2027.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Jyoti Infra JV-Patna. Acceptance / agreement reference: 01238810092252 dt. 02.12.2023. Work started on 12-06-2023.
QWhat is the cost of this railway work?
The tendered cost of "Earth Work & Blanketing for Railway Formation work, Minor br" is ₹130.22 Cr (against an estimate of ₹154.02 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earth Work & Blanketing for Railway Formation work, Minor br" is one of hundreds of railway works covered.