East Central RailwayOverdue

Linking of BG track manually, linking level crossing, unloading, spreading stone ballast, leading and unloading of 52/60kg. Rail, PSC sleeper etc. in Jagdishpur and Benipur yard in connection with SKI-HPO new line work.

Work #180
As of June 2026

Estimate Cost

₹1.41 Cr

Sanctioned estimate

Tendered Cost

₹1.41 Cr

0.0% vs estimate

Physical Progress

65%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹1.41 Cr
Progress65%
Started15-04-2017
Target DOC31-05-2019
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
180
Agency
Jagriti Construction
At & PO Bihat, Zero Mile, Tola Gurudaspur, Begusarai
Acceptance / LOA
ECR/CAO/C/N/ETN-47-16-17 Dt 04.04.2017 ** ECR/CAO/Con/WT/Agt/10 dt.18.7.17
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹1.41 Cr
Tendered Cost
₹1.41 Cr
Physical Progress
65%
Date Started
15-04-2017
Original DOC
03-08-2017
Extended DOC
31-05-2019

Linking of BG track manually, linking level crossing, unloading, spreading stone ballast, leading and unloading of 52/60kg. Rail, PSC sleeper etc. in Jagdishpur and Benipur yard in connection with SKI-HPO new line work. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Jagriti Construction. The tendered cost of the work is ₹1.41 Cr, and it is currently Overdue with physical progress recorded at 65%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Linking of BG track manually, linking level crossing, unloading, spreading stone"?
Status: Overdue (overdue). This East Central Railway work is being executed by Jagriti Construction. Physical progress stands at 65%. Current date of completion (DOC): 31-05-2019.
QWho is the agency for this Bihar railway project?
The agency for this work is Jagriti Construction, At & PO Bihat, Zero Mile, Tola Gurudaspur, Begusarai. Acceptance / agreement reference: ECR/CAO/C/N/ETN-47-16-17 Dt 04.04.2017 ** ECR/CAO/Con/WT/Agt/10 dt.18.7.17. Work started on 15-04-2017.
QWhat is the cost of this railway work?
The tendered cost of "Linking of BG track manually, linking level crossing, unload" is ₹1.41 Cr (against an estimate of ₹1.41 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking of BG track manually, linking level crossing, unload" is one of hundreds of railway works covered.