Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 09 BR 08 BR 07 BR 06) of NH 27 from Km. 0.000 to 145.646 in the State of Bihar on Single percentage rate contract mode.
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹224 Cr
Contract value
Length
145.646 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under Construction (AD issued)
Due Date
22-01-2027
Likely Date
22-01-2027
Completion
0.0%
Physical Done
Project Timeline
Awarded
23-01-2026
Construction Started
23-01-2026
In Progress
Near Completion
-
Completed
22-01-2027
Physical vs Financial Progress
Project Details
UPC
N/02023/02012/BR
National Highway
27
Regional Office
RO-Patna
State
Bihar
Mode
Item Rate
Length
145.646 km
Contractor
Kaluwala Construction Private Limited
Project Stage
Under Construction (AD issued)
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹224.16 Cr
Capital Cost
N/A
Start Date
23-01-2026
PCOD Date
-
Scheduled Completion
22-01-2027
Likely Completion
22-01-2027
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:44:36
Contractor Profile
Kaluwala Construction Private Limited
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 145.646 km on 27, improving regional connectivity.
Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 09 BR 08 BR 07 BR 06) of NH 27 from Km. 0.000 to 145.646 in the State of Bihar on Single percentage rate contract mode. is a National Highways Authority of India (NHAI) project on 27 in Bihar. The project has an awarded cost of ₹224.16 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR "?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 22-01-2027. Likely completion: 22-01-2027.
- QWho is the contractor for this NHAI highway project?
- The contractor for Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 09 BR 08 BR 07 BR 06) of NH 27 from Km. 0.000 to 145.646 in the State of Bihar on Single percentage rate contract mode. is Kaluwala Construction Private Limited. The project is under RO-Patna and covers 145.646 km on 27.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹224.16 Crore. The project is on 27 in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/02023/02012/BR in NHAI?
- UPC (Unique Project Code) N/02023/02012/BR refers to "Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 09 BR 08 BR 07 BR 06) of NH 27 from Km. 0.000 to 145.646 in the State of Bihar on Single percentage rate contract mode." — a National Highway project on 27 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.