Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 04 BR 03 BR 02 BR 01) of NH 27 from Km. 156.456 TO KM. 285.007 in the State of Bihar on Single percentage rate contract mode.
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹142 Cr
Contract value
Length
128.551 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under Construction (AD issued)
Due Date
20-02-2027
Likely Date
20-02-2027
Completion
0.0%
Physical Done
Project Timeline
Awarded
21-02-2026
Construction Started
21-02-2026
In Progress
Near Completion
-
Completed
20-02-2027
Physical vs Financial Progress
Project Details
UPC
N/02023/02011/BR
National Highway
27
Regional Office
RO-Patna
State
Bihar
Mode
Item Rate
Length
128.551 km
Contractor
SRSC INFRA PRIVATE LIMITED
Project Stage
Under Construction (AD issued)
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹142.25 Cr
Capital Cost
N/A
Start Date
21-02-2026
PCOD Date
-
Scheduled Completion
20-02-2027
Likely Completion
20-02-2027
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:43:33
Contractor Profile
SRSC INFRA PRIVATE LIMITED
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 128.551 km on 27, improving regional connectivity.
Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 04 BR 03 BR 02 BR 01) of NH 27 from Km. 156.456 TO KM. 285.007 in the State of Bihar on Single percentage rate contract mode. is a National Highways Authority of India (NHAI) project on 27 in Bihar. The project has an awarded cost of ₹142.25 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR "?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 20-02-2027. Likely completion: 20-02-2027.
- QWho is the contractor for this NHAI highway project?
- The contractor for Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 04 BR 03 BR 02 BR 01) of NH 27 from Km. 156.456 TO KM. 285.007 in the State of Bihar on Single percentage rate contract mode. is SRSC INFRA PRIVATE LIMITED. The project is under RO-Patna and covers 128.551 km on 27.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹142.25 Crore. The project is on 27 in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/02023/02011/BR in NHAI?
- UPC (Unique Project Code) N/02023/02011/BR refers to "Strengthening and Major Maintenance of Muzaffarpur Darbhanga Purnea section (BR 04 BR 03 BR 02 BR 01) of NH 27 from Km. 156.456 TO KM. 285.007 in the State of Bihar on Single percentage rate contract mode." — a National Highway project on 27 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.