Work of Widening/upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib to Malout road from Km 279.400 to Km 307.060 section of NH-354 in the State of Punjab on EPC mode. Job No. NH-354-PB-2021-22-555
Original Cost
₹153 Cr
Baseline estimate
Revised Cost
₹153 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹153 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹153 Cr
Total
₹153 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/04/2025
Revised Completion
31/03/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹153 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹153 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Work of Widening/upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib to Malout road from Km 279.400 to Km 307.060 section of NH-354 in the State of Punjab on EPC mode. Job No. NH-354-PB-2021-22-555 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹153.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Work of Widening/upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib "?
- Work of Widening/upgradation of 2-Lane with paved shoulder of Sri Muktsar Sahib to Malout road from Km 279.400 to Km 307.060 section of NH-354 in the State of Punjab on EPC mode. Job No. NH-354-PB-2021-22-555 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹153 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹153 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Work of Widening/upgradation of 2-Lane with paved shoulder o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618023. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Work of Widening/upgradation of 2-Lane with paved shoulder o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.