Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km Design Ch.84.100km to Ch.96.000 km of Sagunbashi forest near Nichinta to starting of Krishnai Bypass Section of Bilasipura Guwahati road NH 17 on EPC Package-7
Original Cost
₹287 Cr
Baseline estimate
Revised Cost
₹287 Cr
Latest approved cost
Expenditure
₹187 Cr
Spent to date
Utilization
65.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹100 Cr
Budget left
Budget Utilization
65.0%Spent
₹187 Cr
Remaining
₹100 Cr
Total
₹287 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/10/2025
Revised Completion
31/01/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹287 Cr — no cost escalation recorded.
Expenditure stands at ₹187 Cr, which is 65.0% of the revised project cost.
Remaining budget: ₹100 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km Design Ch.84.100km to Ch.96.000 km of Sagunbashi forest near Nichinta to starting of Krishnai Bypass Section of Bilasipura Guwahati road NH 17 on EPC Package-7 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹287.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.9"?
- Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. 88.000km to Ch.99.930 km Design Ch.84.100km to Ch.96.000 km of Sagunbashi forest near Nichinta to starting of Krishnai Bypass Section of Bilasipura Guwahati road NH 17 on EPC Package-7 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹287 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹287 Cr has not been significantly revised. Expenditure: ₹187 Cr (65.0% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618285. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4 -Lane with Paved Shoulder from Ch. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.