Roads & HighwaysIPM · Central Project#618371

Widening/Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur near Bhairiguri Village to Kachukhana Harichara Paglagaunj Package-I of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 Design Km 0.000 to Km 27.650, Design Length27.650 Km under JICA ODA Loan assistance Phase-V -Balance work

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹614 CrUtilization: 62.8%

Original Cost

₹614 Cr

Baseline estimate

On budget

Revised Cost

₹614 Cr

Latest approved cost

Expenditure

₹386 Cr

Spent to date

Utilization

62.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹228 Cr

Budget left

Budget Utilization

62.8%
0%25%50%75%100%

Spent

₹386 Cr

Remaining

₹228 Cr

Total

₹614 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

25/11/2026

Revised Completion

25/11/2026

Completed

Project Details

Project Code618371
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹614 Cr
Revised Cost₹614 Cr
Expenditure₹386 Cr
Original End Date25/11/2026
Revised Date25/11/2026

Project Intelligence

Project is within original budget of ₹614 Cr — no cost escalation recorded.

Expenditure stands at ₹386 Cr, which is 62.8% of the revised project cost.

Remaining budget: ₹228 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur near Bhairiguri Village to Kachukhana Harichara Paglagaunj Package-I of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 Design Km 0.000 to Km 27.650, Design Length27.650 Km under JICA ODA Loan assistance Phase-V -Balance work is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹614.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Improvement to 4-Lane with Paved Shoulder configuration of existing sin"?
Widening/Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Srirampur near Bhairiguri Village to Kachukhana Harichara Paglagaunj Package-I of Srirampur - Dhubri Section of NH-127B from existing Km 0.000 to Km 28.050 Design Km 0.000 to Km 27.650, Design Length27.650 Km under JICA ODA Loan assistance Phase-V -Balance work is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹614 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹614 Cr has not been significantly revised. Expenditure: ₹386 Cr (62.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Improvement to 4-Lane with Paved Shoulder configura is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618371. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with Paved Shoulder configura is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.