Roads & HighwaysIPM · Central Project +6.6% overrun#618708

Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana

Ministry of Road Transport & HighwaysKerala
Revised Cost: ₹1265 CrUtilization: 63.8%Overrun: +₹78 Cr

Original Cost

₹1187 Cr

Baseline estimate

+7% overrun

Revised Cost

₹1265 Cr

Latest approved cost

Expenditure

₹807 Cr

Spent to date

Utilization

63.8%

Of revised budget

Escalated

Cost Status

+6.6%

+₹78 Cr increase

Remaining

₹458 Cr

Budget left

Budget Utilization

63.8%
0%25%50%75%100%

Spent

₹807 Cr

Remaining

₹458 Cr

Total

₹1265 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1187 Cr

Revised Cost

₹1265 Cr

Increase

+₹78 Cr

Escalation

+6.6%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

25/06/2025

Revised Completion

31/03/2027

Completed

Project Details

Project Code618708
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKerala
Data Month2026-08

Financial Summary

Original Cost₹1187 Cr
Revised Cost₹1265 Cr
Expenditure₹807 Cr
Original End Date25/06/2025
Revised Date31/03/2027

Project Intelligence

Cost has increased by ₹78 Cr (6.6%) from the original estimate of ₹1187 Cr.

Expenditure stands at ₹807 Cr, which is 63.8% of the revised project cost.

Remaining budget: ₹458 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1187.00 Cr, later revised to ₹1265.47 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L"?
Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Kerala. Original cost: ₹1187 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1187 Cr and has been revised to ₹1265 Cr — a cost overrun of +6.6%. Expenditure to date: ₹807 Cr (63.8% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Development of Existing NH-85 from Km 0.000 to Km 1 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618708. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Development of Existing NH-85 from Km 0.000 to Km 1 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.