Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana
Original Cost
₹1187 Cr
Baseline estimate
Revised Cost
₹1265 Cr
Latest approved cost
Expenditure
₹807 Cr
Spent to date
Utilization
63.8%
Of revised budget
Cost Status
+6.6%
+₹78 Cr increase
Remaining
₹458 Cr
Budget left
Budget Utilization
63.8%Spent
₹807 Cr
Remaining
₹458 Cr
Total
₹1265 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1187 Cr
Revised Cost
₹1265 Cr
Increase
+₹78 Cr
Escalation
+6.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/06/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹78 Cr (6.6%) from the original estimate of ₹1187 Cr.
Expenditure stands at ₹807 Cr, which is 63.8% of the revised project cost.
Remaining budget: ₹458 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1187.00 Cr, later revised to ₹1265.47 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L"?
- Widening/Development of Existing NH-85 from Km 0.000 to Km 124.636 section to 2L/LPS section in the state of Kerala on EPC Mode under Bharatmala Pariyojana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Kerala. Original cost: ₹1187 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1187 Cr and has been revised to ₹1265 Cr — a cost overrun of +6.6%. Expenditure to date: ₹807 Cr (63.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/Development of Existing NH-85 from Km 0.000 to Km 1 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618708. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Development of Existing NH-85 from Km 0.000 to Km 1 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.