Roads & HighwaysIPM · Central Project#618353

Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur NH-137 in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak Package-8 on EPC mode under NHO-NE Package 8

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹904 CrUtilization: 62.3%

Original Cost

₹904 Cr

Baseline estimate

On budget

Revised Cost

₹904 Cr

Latest approved cost

Expenditure

₹564 Cr

Spent to date

Utilization

62.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹340 Cr

Budget left

Budget Utilization

62.3%
0%25%50%75%100%

Spent

₹564 Cr

Remaining

₹340 Cr

Total

₹904 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/08/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618353
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹904 Cr
Revised Cost₹904 Cr
Expenditure₹564 Cr
Original End Date29/08/2025
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹904 Cr — no cost escalation recorded.

Expenditure stands at ₹564 Cr, which is 62.3% of the revised project cost.

Remaining budget: ₹340 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur NH-137 in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak Package-8 on EPC mode under NHO-NE Package 8 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹904.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to "?
Widening & Upgradation to 2-lanes with paved shoulders road from Tamenglong to Mahur NH-137 in the State of Assam starting from km 116.480 near Hangrum to km 136.500 near Hejaichak Package-8 on EPC mode under NHO-NE Package 8 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹904 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹904 Cr has not been significantly revised. Expenditure: ₹564 Cr (62.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening & Upgradation to 2-lanes with paved shoulders road is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618353. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening & Upgradation to 2-lanes with paved shoulders road is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.