Widening & Up-gradation to 2 lane with Paved shoulder of NH-301 Kargil- Zanskar Road from Design km 57.000 Ex. Km. 57.905 to Km 87.000 Ex. Km. 88.2491 of 30.000 Km length Pkg-lll
Original Cost
₹381 Cr
Baseline estimate
Revised Cost
₹381 Cr
Latest approved cost
Expenditure
₹316 Cr
Spent to date
Utilization
83.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹65 Cr
Budget left
Budget Utilization
83.0%Spent
₹316 Cr
Remaining
₹65 Cr
Total
₹381 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/01/2023
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹381 Cr — no cost escalation recorded.
Expenditure stands at ₹316 Cr, which is 83.0% of the revised project cost.
Remaining budget: ₹65 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening & Up-gradation to 2 lane with Paved shoulder of NH-301 Kargil- Zanskar Road from Design km 57.000 Ex. Km. 57.905 to Km 87.000 Ex. Km. 88.2491 of 30.000 Km length Pkg-lll is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹381.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening & Up-gradation to 2 lane with Paved shoulder of NH-301 Kargil- Zanskar "?
- Widening & Up-gradation to 2 lane with Paved shoulder of NH-301 Kargil- Zanskar Road from Design km 57.000 Ex. Km. 57.905 to Km 87.000 Ex. Km. 88.2491 of 30.000 Km length Pkg-lll is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Ladakh. Original cost: ₹381 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹381 Cr has not been significantly revised. Expenditure: ₹316 Cr (83.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening & Up-gradation to 2 lane with Paved shoulder of NH- is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618409. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening & Up-gradation to 2 lane with Paved shoulder of NH- is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.