Widening to two/four lane with paved shoulders from Km.34.250 to Km.71.830 of NH-365A on Kodad-Khammam-Kurvi road.
Original Cost
₹446 Cr
Baseline estimate
Revised Cost
₹446 Cr
Latest approved cost
Expenditure
₹67 Cr
Spent to date
Utilization
15.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹379 Cr
Budget left
Budget Utilization
15.1%Spent
₹67 Cr
Remaining
₹379 Cr
Total
₹446 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/01/2027
Revised Completion
31/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹446 Cr — no cost escalation recorded.
Expenditure stands at ₹67 Cr, which is 15.1% of the revised project cost.
Remaining budget: ₹379 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to two/four lane with paved shoulders from Km.34.250 to Km.71.830 of NH-365A on Kodad-Khammam-Kurvi road. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹446.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to two/four lane with paved shoulders from Km.34.250 to Km.71.830 of NH"?
- Widening to two/four lane with paved shoulders from Km.34.250 to Km.71.830 of NH-365A on Kodad-Khammam-Kurvi road. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹446 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹446 Cr has not been significantly revised. Expenditure: ₹67 Cr (15.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to two/four lane with paved shoulders from Km.34.25 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618140. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to two/four lane with paved shoulders from Km.34.25 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.