Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 Existing chainages of Mangalore - Tumkur section of NH-73 in the State of Karnataka on EPC Mode under Annual Plan 2021-22 Job No NH-73-KNT-2021-22-945
Original Cost
₹719 Cr
Baseline estimate
Revised Cost
₹719 Cr
Latest approved cost
Expenditure
₹523 Cr
Spent to date
Utilization
72.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹196 Cr
Budget left
Budget Utilization
72.7%Spent
₹523 Cr
Remaining
₹196 Cr
Total
₹719 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
26/03/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹719 Cr — no cost escalation recorded.
Expenditure stands at ₹523 Cr, which is 72.7% of the revised project cost.
Remaining budget: ₹196 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 Existing chainages of Mangalore - Tumkur section of NH-73 in the State of Karnataka on EPC Mode under Annual Plan 2021-22 Job No NH-73-KNT-2021-22-945 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹719.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 Existing c"?
- Widening to two lane with paved Shoulders from Km 40.00 to Km 75.00 Existing chainages of Mangalore - Tumkur section of NH-73 in the State of Karnataka on EPC Mode under Annual Plan 2021-22 Job No NH-73-KNT-2021-22-945 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹719 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹719 Cr has not been significantly revised. Expenditure: ₹523 Cr (72.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to two lane with paved Shoulders from Km 40.00 to K is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617955. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to two lane with paved Shoulders from Km 40.00 to K is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.