Widening to four lane with paved shoulder from Design Km.49.200 to Km.89.285 of NH-731B on EPC mode in the state of Uttar Pradesh
Original Cost
₹918 Cr
Baseline estimate
Revised Cost
₹965 Cr
Latest approved cost
Expenditure
₹685 Cr
Spent to date
Utilization
71.0%
Of revised budget
Cost Status
+5.2%
+₹47 Cr increase
Remaining
₹280 Cr
Budget left
Budget Utilization
71.0%Spent
₹685 Cr
Remaining
₹280 Cr
Total
₹965 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹918 Cr
Revised Cost
₹965 Cr
Increase
+₹47 Cr
Escalation
+5.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/01/2026
Revised Completion
31/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹47 Cr (5.2%) from the original estimate of ₹918 Cr.
Expenditure stands at ₹685 Cr, which is 71.0% of the revised project cost.
Remaining budget: ₹280 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to four lane with paved shoulder from Design Km.49.200 to Km.89.285 of NH-731B on EPC mode in the state of Uttar Pradesh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹918.00 Cr, later revised to ₹965.30 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to four lane with paved shoulder from Design Km.49.200 to Km.89.285 of "?
- Widening to four lane with paved shoulder from Design Km.49.200 to Km.89.285 of NH-731B on EPC mode in the state of Uttar Pradesh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹918 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹918 Cr and has been revised to ₹965 Cr — a cost overrun of +5.2%. Expenditure to date: ₹685 Cr (71.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to four lane with paved shoulder from Design Km.49. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618168. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to four lane with paved shoulder from Design Km.49. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.