Widening to existing 2 lane with paved Shoulder to 4 Lane with paved shoulder from design Km 153.00 to 168.27 Mala Gate to Karkala of NH -169 on Shimoga - Mangalore section in the state of Karnataka on EPC mode under Annula Plan 2021-22 Job No. NH-169-KNT-2021-22-949
Original Cost
₹178 Cr
Baseline estimate
Revised Cost
₹178 Cr
Latest approved cost
Expenditure
₹136 Cr
Spent to date
Utilization
76.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹42 Cr
Budget left
Budget Utilization
76.2%Spent
₹136 Cr
Remaining
₹42 Cr
Total
₹178 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
13/02/2025
Revised Completion
30/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹178 Cr — no cost escalation recorded.
Expenditure stands at ₹136 Cr, which is 76.2% of the revised project cost.
Remaining budget: ₹42 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to existing 2 lane with paved Shoulder to 4 Lane with paved shoulder from design Km 153.00 to 168.27 Mala Gate to Karkala of NH -169 on Shimoga - Mangalore section in the state of Karnataka on EPC mode under Annula Plan 2021-22 Job No. NH-169-KNT-2021-22-949 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹178.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to existing 2 lane with paved Shoulder to 4 Lane with paved shoulder fr"?
- Widening to existing 2 lane with paved Shoulder to 4 Lane with paved shoulder from design Km 153.00 to 168.27 Mala Gate to Karkala of NH -169 on Shimoga - Mangalore section in the state of Karnataka on EPC mode under Annula Plan 2021-22 Job No. NH-169-KNT-2021-22-949 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹178 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹178 Cr has not been significantly revised. Expenditure: ₹136 Cr (76.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to existing 2 lane with paved Shoulder to 4 Lane wi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617998. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to existing 2 lane with paved Shoulder to 4 Lane wi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.