Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023
Original Cost
₹786 Cr
Baseline estimate
Revised Cost
₹786 Cr
Latest approved cost
Expenditure
₹129 Cr
Spent to date
Utilization
16.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹657 Cr
Budget left
Budget Utilization
16.4%Spent
₹129 Cr
Remaining
₹657 Cr
Total
₹786 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/04/2028
Revised Completion
23/04/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹786 Cr — no cost escalation recorded.
Expenditure stands at ₹129 Cr, which is 16.4% of the revised project cost.
Remaining budget: ₹657 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹786.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chik"?
- Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹786 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹786 Cr has not been significantly revised. Expenditure: ₹129 Cr (16.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618148. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.