Roads & HighwaysIPM · Central Project#618148

Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹786 CrUtilization: 16.4%

Original Cost

₹786 Cr

Baseline estimate

On budget

Revised Cost

₹786 Cr

Latest approved cost

Expenditure

₹129 Cr

Spent to date

Utilization

16.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹657 Cr

Budget left

Budget Utilization

16.4%
0%25%50%75%100%

Spent

₹129 Cr

Remaining

₹657 Cr

Total

₹786 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/04/2028

Revised Completion

23/04/2028

Completed

Project Details

Project Code618148
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹786 Cr
Revised Cost₹786 Cr
Expenditure₹129 Cr
Original End Date23/04/2028
Revised Date23/04/2028

Project Intelligence

Project is within original budget of ₹786 Cr — no cost escalation recorded.

Expenditure stands at ₹129 Cr, which is 16.4% of the revised project cost.

Remaining budget: ₹657 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹786.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chik"?
Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to Km 140.200 Near Chikkodi excluding length from Km 118.450 to Km 128.450 in the State of Karnataka under NH O on EPC Mode under Annual Plan 2022-23 - Package 1 NH-548B-KNT-2022-23-979 dated 09.03.2023 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹786 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹786 Cr has not been significantly revised. Expenditure: ₹129 Cr (16.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618148. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 4LPS of NH-548B from Km 80.000 Near Murgundi to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.