Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka under NH O on EPC Mode Under Annual Plan 2022-23 NH-548B-KNT-2022-23-982
Original Cost
₹1084 Cr
Baseline estimate
Revised Cost
₹1084 Cr
Latest approved cost
Expenditure
₹100 Cr
Spent to date
Utilization
9.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹984 Cr
Budget left
Budget Utilization
9.2%Spent
₹100 Cr
Remaining
₹984 Cr
Total
₹1084 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
29/05/2029
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1084 Cr — no cost escalation recorded.
Expenditure stands at ₹100 Cr, which is 9.2% of the revised project cost.
Remaining budget: ₹984 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka under NH O on EPC Mode Under Annual Plan 2022-23 NH-548B-KNT-2022-23-982 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1084.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi to Km 128.450 Near An"?
- Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka under NH O on EPC Mode Under Annual Plan 2022-23 NH-548B-KNT-2022-23-982 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹1084 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1084 Cr has not been significantly revised. Expenditure: ₹100 Cr (9.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi t is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618151. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 4LPS of NH-548B from Km 118.450 Near Shirguppi t is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.