Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4
Original Cost
₹580 Cr
Baseline estimate
Revised Cost
₹580 Cr
Latest approved cost
Expenditure
₹408 Cr
Spent to date
Utilization
70.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹172 Cr
Budget left
Budget Utilization
70.4%Spent
₹408 Cr
Remaining
₹172 Cr
Total
₹580 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
29/12/2023
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹580 Cr — no cost escalation recorded.
Expenditure stands at ₹408 Cr, which is 70.4% of the revised project cost.
Remaining budget: ₹172 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹580.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 fr"?
- Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹580 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹580 Cr has not been significantly revised. Expenditure: ₹408 Cr (70.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618336. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.