Roads & HighwaysIPM · Central Project#618336

Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4

Ministry of Road Transport & HighwaysManipur
Revised Cost: ₹580 CrUtilization: 70.4%

Original Cost

₹580 Cr

Baseline estimate

On budget

Revised Cost

₹580 Cr

Latest approved cost

Expenditure

₹408 Cr

Spent to date

Utilization

70.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹172 Cr

Budget left

Budget Utilization

70.4%
0%25%50%75%100%

Spent

₹408 Cr

Remaining

₹172 Cr

Total

₹580 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/12/2023

Revised Completion

31/12/2026

Completed

Project Details

Project Code618336
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹580 Cr
Revised Cost₹580 Cr
Expenditure₹408 Cr
Original End Date29/12/2023
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹580 Cr — no cost escalation recorded.

Expenditure stands at ₹408 Cr, which is 70.4% of the revised project cost.

Remaining budget: ₹172 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹580.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 fr"?
Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 66.110 km to 101.280 Km Existing Chainage km 67.496 to km 103.557 on EPC Mode in Manipur PKG-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹580 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹580 Cr has not been significantly revised. Expenditure: ₹408 Cr (70.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618336. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 -Lane with Paved shoulder of Imphal to Jiribam is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.