Widening to 2 Lane from Existing Chainage Km 74.700 Km 100.660 Design Chainage Km 53.365 to Km 78.785 on NH- 507 in the State of Uttarakhand.

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹347 CrUtilization: 0.0%

Original Cost

₹347 Cr

Baseline estimate

On budget

Revised Cost

₹347 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹347 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹347 Cr

Total

₹347 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/04/2028

Revised Completion

Completed

Project Details

Project Code618039
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹347 Cr
Revised Cost₹347 Cr
Expenditure₹0 Cr
Original End Date23/04/2028
Revised DateN/A

Project Intelligence

Project is within original budget of ₹347 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹347 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 2 Lane from Existing Chainage Km 74.700 Km 100.660 Design Chainage Km 53.365 to Km 78.785 on NH- 507 in the State of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹347.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 2 Lane from Existing Chainage Km 74.700 Km 100.660 Design Chainage "?
Widening to 2 Lane from Existing Chainage Km 74.700 Km 100.660 Design Chainage Km 53.365 to Km 78.785 on NH- 507 in the State of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹347 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹347 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 2 Lane from Existing Chainage Km 74.700 Km 100. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618039. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 Lane from Existing Chainage Km 74.700 Km 100. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.