Revised Cost: ₹301 CrUtilization: 84.0%

Original Cost

₹317 Cr

Baseline estimate

On budget

Revised Cost

₹301 Cr

Latest approved cost

Expenditure

₹252 Cr

Spent to date

Utilization

84.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹48 Cr

Budget left

Budget Utilization

84.0%
0%25%50%75%100%

Spent

₹252 Cr

Remaining

₹48 Cr

Total

₹301 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/07/2024

Revised Completion

31/12/2026

Completed

Project Details

Project Code617983
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTelangana
Data Month2026-08

Financial Summary

Original Cost₹317 Cr
Revised Cost₹301 Cr
Expenditure₹252 Cr
Original End Date16/07/2024
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹317 Cr — no cost escalation recorded.

Expenditure stands at ₹252 Cr, which is 84.0% of the revised project cost.

Remaining budget: ₹48 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening & Strengthening of Existing 2LPS to 4 lane PS from Km 150000 to Km 159000 and Km 165400 to Km 186000 of NH-163 old NH-202 under NH O for the year 2020-21 on EPC Mode in the state of Telangana. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹317.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening & Strengthening of Existing 2LPS to 4 lane PS from Km 150000 to Km 159"?
Widening & Strengthening of Existing 2LPS to 4 lane PS from Km 150000 to Km 159000 and Km 165400 to Km 186000 of NH-163 old NH-202 under NH O for the year 2020-21 on EPC Mode in the state of Telangana. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹317 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹317 Cr and has been revised to ₹301 Cr — a cost overrun of -5.2%. Expenditure to date: ₹252 Cr (84.0% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening & Strengthening of Existing 2LPS to 4 lane PS from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617983. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening & Strengthening of Existing 2LPS to 4 lane PS from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.