Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Sautada to Shirapur Section of NH-561 from Design km 86300 to km 125589 in the state of Maharashtra on EPC mode. Design length 39.289 km
Original Cost
₹350 Cr
Baseline estimate
Revised Cost
₹350 Cr
Latest approved cost
Expenditure
₹78 Cr
Spent to date
Utilization
22.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹272 Cr
Budget left
Budget Utilization
22.2%Spent
₹78 Cr
Remaining
₹272 Cr
Total
₹350 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/11/2026
Revised Completion
04/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹350 Cr — no cost escalation recorded.
Expenditure stands at ₹78 Cr, which is 22.2% of the revised project cost.
Remaining budget: ₹272 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Sautada to Shirapur Section of NH-561 from Design km 86300 to km 125589 in the state of Maharashtra on EPC mode. Design length 39.289 km is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹350.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane "?
- Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Sautada to Shirapur Section of NH-561 from Design km 86300 to km 125589 in the state of Maharashtra on EPC mode. Design length 39.289 km is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹350 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹350 Cr has not been significantly revised. Expenditure: ₹78 Cr (22.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening, Reconstruction & Up-gradation to 2 lane with Paved is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618138. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening, Reconstruction & Up-gradation to 2 lane with Paved is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.