Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Ahmednagar to Sabalkhed & Ashti to Chinchpur Section of NH-561 from Design km 2915 to km 37728 & Design km 55100 to km 70000 in the State of Maharashtra on EPC mode. Length 49.713 km
Original Cost
₹657 Cr
Baseline estimate
Revised Cost
₹657 Cr
Latest approved cost
Expenditure
₹383 Cr
Spent to date
Utilization
58.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹274 Cr
Budget left
Budget Utilization
58.3%Spent
₹383 Cr
Remaining
₹274 Cr
Total
₹657 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/05/2027
Revised Completion
27/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹657 Cr — no cost escalation recorded.
Expenditure stands at ₹383 Cr, which is 58.3% of the revised project cost.
Remaining budget: ₹274 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Ahmednagar to Sabalkhed & Ashti to Chinchpur Section of NH-561 from Design km 2915 to km 37728 & Design km 55100 to km 70000 in the State of Maharashtra on EPC mode. Length 49.713 km is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹657.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane "?
- Widening, Reconstruction & Up-gradation to 2 lane with Paved Shoulder/Four Lane configuration for the work of Ahmednagar to Sabalkhed & Ashti to Chinchpur Section of NH-561 from Design km 2915 to km 37728 & Design km 55100 to km 70000 in the State of Maharashtra on EPC mode. Length 49.713 km is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹657 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹657 Cr has not been significantly revised. Expenditure: ₹383 Cr (58.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening, Reconstruction & Up-gradation to 2 lane with Paved is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618047. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening, Reconstruction & Up-gradation to 2 lane with Paved is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.