Roads & HighwaysIPM · Central Project#618193

Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹369 CrUtilization: 36.6%

Original Cost

₹369 Cr

Baseline estimate

On budget

Revised Cost

₹369 Cr

Latest approved cost

Expenditure

₹135 Cr

Spent to date

Utilization

36.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹234 Cr

Budget left

Budget Utilization

36.6%
0%25%50%75%100%

Spent

₹135 Cr

Remaining

₹234 Cr

Total

₹369 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/12/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code618193
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹369 Cr
Revised Cost₹369 Cr
Expenditure₹135 Cr
Original End Date23/12/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹369 Cr — no cost escalation recorded.

Expenditure stands at ₹135 Cr, which is 36.6% of the revised project cost.

Remaining budget: ₹234 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹369.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km "?
Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹369 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹369 Cr has not been significantly revised. Expenditure: ₹135 Cr (36.6% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening of Existing Road to Two Lane with Paved Shoulder Co is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618193. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of Existing Road to Two Lane with Paved Shoulder Co is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.