Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode
Original Cost
₹369 Cr
Baseline estimate
Revised Cost
₹369 Cr
Latest approved cost
Expenditure
₹135 Cr
Spent to date
Utilization
36.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹234 Cr
Budget left
Budget Utilization
36.6%Spent
₹135 Cr
Remaining
₹234 Cr
Total
₹369 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/12/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹369 Cr — no cost escalation recorded.
Expenditure stands at ₹135 Cr, which is 36.6% of the revised project cost.
Remaining budget: ₹234 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹369.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km "?
- Widening of Existing Road to Two Lane with Paved Shoulder Configuration from Km 0.00 to 26.000 & Km 45.200 To 59.622 Of NH 365BB in the State of Andhra Pradesh Under Annual Plan 2023-24 through EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹369 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹369 Cr has not been significantly revised. Expenditure: ₹135 Cr (36.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening of Existing Road to Two Lane with Paved Shoulder Co is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618193. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of Existing Road to Two Lane with Paved Shoulder Co is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.