Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu
Original Cost
₹198 Cr
Baseline estimate
Revised Cost
₹240 Cr
Latest approved cost
Expenditure
₹174 Cr
Spent to date
Utilization
72.5%
Of revised budget
Cost Status
+21.0%
+₹42 Cr increase
Remaining
₹66 Cr
Budget left
Budget Utilization
72.5%Spent
₹174 Cr
Remaining
₹66 Cr
Total
₹240 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹198 Cr
Revised Cost
₹240 Cr
Increase
+₹42 Cr
Escalation
+21.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/06/2026
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹42 Cr (21.0%) from the original estimate of ₹198 Cr.
Expenditure stands at ₹174 Cr, which is 72.5% of the revised project cost.
Remaining budget: ₹66 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹198.00 Cr, later revised to ₹239.57 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19."?
- Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Dadra & Nagar Haveli and Daman & Diu. Original cost: ₹198 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹198 Cr and has been revised to ₹240 Cr — a cost overrun of +21%. Expenditure to date: ₹174 Cr (72.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening of Existing Road from Intermediate Lane 2-lane to 4 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619183. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of Existing Road from Intermediate Lane 2-lane to 4 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.