Roads & HighwaysIPM · Central Project +21.0% overrun#619183

Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu

Ministry of Road Transport & HighwaysDadra & Nagar Haveli and Daman & Diu
Revised Cost: ₹240 CrUtilization: 72.5%Overrun: +₹42 Cr

Original Cost

₹198 Cr

Baseline estimate

+21% overrun

Revised Cost

₹240 Cr

Latest approved cost

Expenditure

₹174 Cr

Spent to date

Utilization

72.5%

Of revised budget

Escalated

Cost Status

+21.0%

+₹42 Cr increase

Remaining

₹66 Cr

Budget left

Budget Utilization

72.5%
0%25%50%75%100%

Spent

₹174 Cr

Remaining

₹66 Cr

Total

₹240 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹198 Cr

Revised Cost

₹240 Cr

Increase

+₹42 Cr

Escalation

+21.0%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

30/06/2026

Revised Completion

30/09/2026

Completed

Project Details

Project Code619183
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateDadra & Nagar Haveli and Daman & Diu
Data Month2026-08

Financial Summary

Original Cost₹198 Cr
Revised Cost₹240 Cr
Expenditure₹174 Cr
Original End Date30/06/2026
Revised Date30/09/2026

Project Intelligence

Cost has increased by ₹42 Cr (21.0%) from the original estimate of ₹198 Cr.

Expenditure stands at ₹174 Cr, which is 72.5% of the revised project cost.

Remaining budget: ₹66 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹198.00 Cr, later revised to ₹239.57 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19."?
Widening of Existing Road from Intermediate Lane 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Dadra & Nagar Haveli and Daman & Diu. Original cost: ₹198 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹198 Cr and has been revised to ₹240 Cr — a cost overrun of +21%. Expenditure to date: ₹174 Cr (72.5% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening of Existing Road from Intermediate Lane 2-lane to 4 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619183. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of Existing Road from Intermediate Lane 2-lane to 4 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.