Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach Package-II of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 Design Km 27.650 to Km 54.154, Design Length26.504 Km under JICA ODA Loan assistance Phase-V [Srirampur - Dhubri Pkg-2]
Original Cost
₹909 Cr
Baseline estimate
Revised Cost
₹909 Cr
Latest approved cost
Expenditure
₹639 Cr
Spent to date
Utilization
70.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹271 Cr
Budget left
Budget Utilization
70.2%Spent
₹639 Cr
Remaining
₹271 Cr
Total
₹909 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/01/2025
Revised Completion
30/06/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹909 Cr — no cost escalation recorded.
Expenditure stands at ₹639 Cr, which is 70.2% of the revised project cost.
Remaining budget: ₹271 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach Package-II of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 Design Km 27.650 to Km 54.154, Design Length26.504 Km under JICA ODA Loan assistance Phase-V [Srirampur - Dhubri Pkg-2] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹909.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing "?
- Widening / Improvement to 4-Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach Package-II of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 Design Km 27.650 to Km 54.154, Design Length26.504 Km under JICA ODA Loan assistance Phase-V [Srirampur - Dhubri Pkg-2] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹909 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹909 Cr has not been significantly revised. Expenditure: ₹639 Cr (70.2% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening / Improvement to 4-Lane with Paved Shoulder config is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618372. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening / Improvement to 4-Lane with Paved Shoulder config is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.