Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 339.00 to km 380.00 Siaha on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-8
Original Cost
₹637 Cr
Baseline estimate
Revised Cost
₹637 Cr
Latest approved cost
Expenditure
₹552 Cr
Spent to date
Utilization
86.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹85 Cr
Budget left
Budget Utilization
86.6%Spent
₹552 Cr
Remaining
₹85 Cr
Total
₹637 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/09/2023
Revised Completion
30/06/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹637 Cr — no cost escalation recorded.
Expenditure stands at ₹552 Cr, which is 86.6% of the revised project cost.
Remaining budget: ₹85 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 339.00 to km 380.00 Siaha on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-8 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹637.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and up-gradation to 2-lane with paved shoulder configuration and geomet"?
- Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 339.00 to km 380.00 Siaha on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-8 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹637 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹637 Cr has not been significantly revised. Expenditure: ₹552 Cr (86.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and up-gradation to 2-lane with paved shoulder conf is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618383. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and up-gradation to 2-lane with paved shoulder conf is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.