Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-7
Original Cost
₹606 Cr
Baseline estimate
Revised Cost
₹750 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
+23.8%
+₹144 Cr increase
Remaining
₹750 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹750 Cr
Total
₹750 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹606 Cr
Revised Cost
₹750 Cr
Increase
+₹144 Cr
Escalation
+23.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/04/2024
Revised Completion
31/05/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹144 Cr (23.8%) from the original estimate of ₹606 Cr.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹750 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-7 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹606.00 Cr, later revised to ₹750.32 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and up-gradation to 2-lane with paved shoulder configuration and geomet"?
- Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 298.00 to km 339.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-7 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹606 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹606 Cr and has been revised to ₹750 Cr — a cost overrun of +23.8%. Expenditure to date: ₹0 Cr (0.0% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening and up-gradation to 2-lane with paved shoulder conf is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618382. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and up-gradation to 2-lane with paved shoulder conf is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.