Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.00 Lunglei to km 298.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-6
Original Cost
₹769 Cr
Baseline estimate
Revised Cost
₹769 Cr
Latest approved cost
Expenditure
₹169 Cr
Spent to date
Utilization
21.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹600 Cr
Budget left
Budget Utilization
21.9%Spent
₹169 Cr
Remaining
₹600 Cr
Total
₹769 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
16/06/2023
Revised Completion
15/05/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹769 Cr — no cost escalation recorded.
Expenditure stands at ₹169 Cr, which is 21.9% of the revised project cost.
Remaining budget: ₹600 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.00 Lunglei to km 298.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹769.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and up-gradation to 2-lane with paved shoulder configuration and geomet"?
- Widening and up-gradation to 2-lane with paved shoulder configuration and geometric improvements from km 250.00 Lunglei to km 298.00 on Aizawl-Tuipang section under JICA ODA Loan assistance Phase-I Package-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹769 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹769 Cr has not been significantly revised. Expenditure: ₹169 Cr (21.9% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening and up-gradation to 2-lane with paved shoulder conf is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618381. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and up-gradation to 2-lane with paved shoulder conf is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.