Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4
Original Cost
₹899 Cr
Baseline estimate
Revised Cost
₹899 Cr
Latest approved cost
Expenditure
₹192 Cr
Spent to date
Utilization
21.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹707 Cr
Budget left
Budget Utilization
21.3%Spent
₹192 Cr
Remaining
₹707 Cr
Total
₹899 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
24/04/2023
Revised Completion
20/04/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹899 Cr — no cost escalation recorded.
Expenditure stands at ₹192 Cr, which is 21.3% of the revised project cost.
Remaining budget: ₹707 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹899.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geome"?
- Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹899 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹899 Cr has not been significantly revised. Expenditure: ₹192 Cr (21.3% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening and Up-gradation to 2- Lane with Paved Shoulder Con is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618384. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Up-gradation to 2- Lane with Paved Shoulder Con is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.