Revised Cost: ₹899 CrUtilization: 21.3%

Original Cost

₹899 Cr

Baseline estimate

On budget

Revised Cost

₹899 Cr

Latest approved cost

Expenditure

₹192 Cr

Spent to date

Utilization

21.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹707 Cr

Budget left

Budget Utilization

21.3%
0%25%50%75%100%

Spent

₹192 Cr

Remaining

₹707 Cr

Total

₹899 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

24/04/2023

Revised Completion

20/04/2025

Completed

Project Details

Project Code618384
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-05

Financial Summary

Original Cost₹899 Cr
Revised Cost₹899 Cr
Expenditure₹192 Cr
Original End Date24/04/2023
Revised Date20/04/2025

Project Intelligence

Project is within original budget of ₹899 Cr — no cost escalation recorded.

Expenditure stands at ₹192 Cr, which is 21.3% of the revised project cost.

Remaining budget: ₹707 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹899.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geome"?
Widening and Up-gradation to 2- Lane with Paved Shoulder Configuration and geometric improvement from Km. 166. 000 to Km 208.000 Package-4 on Aizawl Tuipang Section of NH-54 in the State of Mizoram Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹899 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹899 Cr has not been significantly revised. Expenditure: ₹192 Cr (21.3% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Widening and Up-gradation to 2- Lane with Paved Shoulder Con is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618384. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Up-gradation to 2- Lane with Paved Shoulder Con is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.