Widening and Strengthening to two Lane with Paved Shoulder/Four Lane with paved shoulder configuration from km. 61.500 of NH-727B near Nawalpur km 178.500 of Sonauli Balia Marg, Old SH-01 i.e. end point of Salempur Bypass to km. 106.495 of NH-727B near Sikanderpur under EPC mode
Original Cost
₹2062 Cr
Baseline estimate
Revised Cost
₹2062 Cr
Latest approved cost
Expenditure
₹600 Cr
Spent to date
Utilization
29.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1462 Cr
Budget left
Budget Utilization
29.1%Spent
₹600 Cr
Remaining
₹1462 Cr
Total
₹2062 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/05/2028
Revised Completion
30/05/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2062 Cr — no cost escalation recorded.
Expenditure stands at ₹600 Cr, which is 29.1% of the revised project cost.
Remaining budget: ₹1462 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Strengthening to two Lane with Paved Shoulder/Four Lane with paved shoulder configuration from km. 61.500 of NH-727B near Nawalpur km 178.500 of Sonauli Balia Marg, Old SH-01 i.e. end point of Salempur Bypass to km. 106.495 of NH-727B near Sikanderpur under EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2062.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Strengthening to two Lane with Paved Shoulder/Four Lane with paved "?
- Widening and Strengthening to two Lane with Paved Shoulder/Four Lane with paved shoulder configuration from km. 61.500 of NH-727B near Nawalpur km 178.500 of Sonauli Balia Marg, Old SH-01 i.e. end point of Salempur Bypass to km. 106.495 of NH-727B near Sikanderpur under EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹2062 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2062 Cr has not been significantly revised. Expenditure: ₹600 Cr (29.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and Strengthening to two Lane with Paved Shoulder/F is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618264. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Strengthening to two Lane with Paved Shoulder/F is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.