Widening and strengthening of Gangakhed to Kingaon section of NH-752K in Km 38/750 to 72/304 Flexible Pavement Length33.554 km to 2-lane configuration on EPC mode in the State of Maharashtra.
Original Cost
₹163 Cr
Baseline estimate
Revised Cost
₹163 Cr
Latest approved cost
Expenditure
₹6 Cr
Spent to date
Utilization
3.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹157 Cr
Budget left
Budget Utilization
3.5%Spent
₹6 Cr
Remaining
₹157 Cr
Total
₹163 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/06/2026
Revised Completion
30/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹163 Cr — no cost escalation recorded.
Expenditure stands at ₹6 Cr, which is 3.5% of the revised project cost.
Remaining budget: ₹157 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and strengthening of Gangakhed to Kingaon section of NH-752K in Km 38/750 to 72/304 Flexible Pavement Length33.554 km to 2-lane configuration on EPC mode in the State of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹163.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and strengthening of Gangakhed to Kingaon section of NH-752K in Km 38/7"?
- Widening and strengthening of Gangakhed to Kingaon section of NH-752K in Km 38/750 to 72/304 Flexible Pavement Length33.554 km to 2-lane configuration on EPC mode in the State of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹163 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹163 Cr has not been significantly revised. Expenditure: ₹6 Cr (3.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and strengthening of Gangakhed to Kingaon section o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618178. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and strengthening of Gangakhed to Kingaon section o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.