Revised Cost: ₹840 CrUtilization: 42.3%

Original Cost

₹840 Cr

Baseline estimate

On budget

Revised Cost

₹840 Cr

Latest approved cost

Expenditure

₹356 Cr

Spent to date

Utilization

42.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹484 Cr

Budget left

Budget Utilization

42.3%
0%25%50%75%100%

Spent

₹356 Cr

Remaining

₹484 Cr

Total

₹840 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2025

Revised Completion

30/04/2026

Completed

Project Details

Project Code618161
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-05

Financial Summary

Original Cost₹840 Cr
Revised Cost₹840 Cr
Expenditure₹356 Cr
Original End Date31/12/2025
Revised Date30/04/2026

Project Intelligence

Project is within original budget of ₹840 Cr — no cost escalation recorded.

Expenditure stands at ₹356 Cr, which is 42.3% of the revised project cost.

Remaining budget: ₹484 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening and Reconstruction of existing road to four lane from Km.56400 to Km 120300 i.e. from B.Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70200 to Km 77105 of NH 716G in the State of Andhra Pradesh on EPC mode Job no. 742 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹840.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening and Reconstruction of existing road to four lane from Km.56400 to Km 12"?
Widening and Reconstruction of existing road to four lane from Km.56400 to Km 120300 i.e. from B.Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70200 to Km 77105 of NH 716G in the State of Andhra Pradesh on EPC mode Job no. 742 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹840 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹840 Cr has not been significantly revised. Expenditure: ₹356 Cr (42.3% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Widening and Reconstruction of existing road to four lane fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618161. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Reconstruction of existing road to four lane fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.