Widening and Reconstruction of existing road to four lane from Km.56400 to Km 120300 i.e. from B.Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70200 to Km 77105 of NH 716G in the State of Andhra Pradesh on EPC mode Job no. 742
Original Cost
₹840 Cr
Baseline estimate
Revised Cost
₹840 Cr
Latest approved cost
Expenditure
₹356 Cr
Spent to date
Utilization
42.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹484 Cr
Budget left
Budget Utilization
42.3%Spent
₹356 Cr
Remaining
₹484 Cr
Total
₹840 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2025
Revised Completion
30/04/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹840 Cr — no cost escalation recorded.
Expenditure stands at ₹356 Cr, which is 42.3% of the revised project cost.
Remaining budget: ₹484 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Reconstruction of existing road to four lane from Km.56400 to Km 120300 i.e. from B.Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70200 to Km 77105 of NH 716G in the State of Andhra Pradesh on EPC mode Job no. 742 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹840.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Reconstruction of existing road to four lane from Km.56400 to Km 12"?
- Widening and Reconstruction of existing road to four lane from Km.56400 to Km 120300 i.e. from B.Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70200 to Km 77105 of NH 716G in the State of Andhra Pradesh on EPC mode Job no. 742 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹840 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹840 Cr has not been significantly revised. Expenditure: ₹356 Cr (42.3% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening and Reconstruction of existing road to four lane fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618161. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Reconstruction of existing road to four lane fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.