Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 to Km. 190.000 Phase-I Package-VIII
Original Cost
₹3834 Cr
Baseline estimate
Revised Cost
₹3820 Cr
Latest approved cost
Expenditure
₹198 Cr
Spent to date
Utilization
5.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹3622 Cr
Budget left
Budget Utilization
5.2%Spent
₹198 Cr
Remaining
₹3622 Cr
Total
₹3820 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/03/2026
Revised Completion
15/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹3834 Cr — no cost escalation recorded.
Expenditure stands at ₹198 Cr, which is 5.2% of the revised project cost.
Remaining budget: ₹3622 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 to Km. 190.000 Phase-I Package-VIII is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹3834.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 to Km. 190.000 Phas"?
- Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 to Km. 190.000 Phase-I Package-VIII is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹3834 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹3834 Cr and has been revised to ₹3820 Cr — a cost overrun of -0.4%. Expenditure to date: ₹198 Cr (5.2% of revised cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618466. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Vadodara Mumbai Expressway Jujuwa - Gandeva from Km. 154.600 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.