Roads & HighwaysIPM · Central Project#618014

Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, Package-III, Badki mahri village to Ramanujganj section from existing km 80.600 to km 110.330 Design Ch. 85.370 to Ch. 114.800 of total length 29.430 km to two lane with paved shoulders udner corridor scheme under EPC Mode in the of Chhattisgarh

Ministry of Road Transport & HighwaysChhattisgarh
Revised Cost: ₹199 CrUtilization: 38.5%

Original Cost

₹199 Cr

Baseline estimate

On budget

Revised Cost

₹199 Cr

Latest approved cost

Expenditure

₹77 Cr

Spent to date

Utilization

38.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹122 Cr

Budget left

Budget Utilization

38.5%
0%25%50%75%100%

Spent

₹77 Cr

Remaining

₹122 Cr

Total

₹199 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/10/2026

Revised Completion

31/10/2026

Completed

Project Details

Project Code618014
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateChhattisgarh
Data Month2026-08

Financial Summary

Original Cost₹199 Cr
Revised Cost₹199 Cr
Expenditure₹77 Cr
Original End Date31/10/2026
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹199 Cr — no cost escalation recorded.

Expenditure stands at ₹77 Cr, which is 38.5% of the revised project cost.

Remaining budget: ₹122 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, Package-III, Badki mahri village to Ramanujganj section from existing km 80.600 to km 110.330 Design Ch. 85.370 to Ch. 114.800 of total length 29.430 km to two lane with paved shoulders udner corridor scheme under EPC Mode in the of Chhattisgarh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹199.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, Package-III, Badki ma"?
Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, Package-III, Badki mahri village to Ramanujganj section from existing km 80.600 to km 110.330 Design Ch. 85.370 to Ch. 114.800 of total length 29.430 km to two lane with paved shoulders udner corridor scheme under EPC Mode in the of Chhattisgarh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Chhattisgarh. Original cost: ₹199 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹199 Cr has not been significantly revised. Expenditure: ₹77 Cr (38.5% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, P is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618014. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation of Ambikapur-Ramanujganj-Garwa road of NH-343, P is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.