Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand Section from KM 159900 To KM 188025 of NH-965DD Section I and 2L With Paved Shoulder of Lonand-Satara Section from KM 51500 To KM 96246 Of NH-965D Section II in Satara District in the State of Maharashtra on EPC Mode under NHO-
Original Cost
₹538 Cr
Baseline estimate
Revised Cost
₹307 Cr
Latest approved cost
Expenditure
₹189 Cr
Spent to date
Utilization
61.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹118 Cr
Budget left
Budget Utilization
61.5%Spent
₹189 Cr
Remaining
₹118 Cr
Total
₹307 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/06/2027
Revised Completion
20/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹538 Cr — no cost escalation recorded.
Expenditure stands at ₹189 Cr, which is 61.5% of the revised project cost.
Remaining budget: ₹118 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand Section from KM 159900 To KM 188025 of NH-965DD Section I and 2L With Paved Shoulder of Lonand-Satara Section from KM 51500 To KM 96246 Of NH-965D Section II in Satara District in the State of Maharashtra on EPC Mode under NHO- is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹538.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand Section from KM 15990"?
- Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand Section from KM 159900 To KM 188025 of NH-965DD Section I and 2L With Paved Shoulder of Lonand-Satara Section from KM 51500 To KM 96246 Of NH-965D Section II in Satara District in the State of Maharashtra on EPC Mode under NHO- is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹538 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹538 Cr and has been revised to ₹307 Cr — a cost overrun of -42.9%. Expenditure to date: ₹189 Cr (61.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand S is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618754. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation of 2L/4L with Paved Shoulder of Shirwal-Lonand S is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.