Roads & HighwaysIPM · Central Project#618136

Upgradatiobn and Rehabilitation of Section of NH 361 F from Parli 00/000 to Gangakhed 30/400 to Two Lanes with paved shoulder / Four lane configurations on EPC mode in the State of Maharashtra.

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹224 CrUtilization: 0.0%

Original Cost

₹224 Cr

Baseline estimate

On budget

Revised Cost

₹224 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹224 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹224 Cr

Total

₹224 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/09/2023

Revised Completion

31/03/2026

Completed

Project Details

Project Code618136
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-05

Financial Summary

Original Cost₹224 Cr
Revised Cost₹224 Cr
Expenditure₹0 Cr
Original End Date16/09/2023
Revised Date31/03/2026

Project Intelligence

Project is within original budget of ₹224 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹224 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Upgradatiobn and Rehabilitation of Section of NH 361 F from Parli 00/000 to Gangakhed 30/400 to Two Lanes with paved shoulder / Four lane configurations on EPC mode in the State of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹224.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Upgradatiobn and Rehabilitation of Section of NH 361 F from Parli 00/000 to Gang"?
Upgradatiobn and Rehabilitation of Section of NH 361 F from Parli 00/000 to Gangakhed 30/400 to Two Lanes with paved shoulder / Four lane configurations on EPC mode in the State of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹224 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹224 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Upgradatiobn and Rehabilitation of Section of NH 361 F from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618136. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradatiobn and Rehabilitation of Section of NH 361 F from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.