Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532
Original Cost
₹263 Cr
Baseline estimate
Revised Cost
₹263 Cr
Latest approved cost
Expenditure
₹194 Cr
Spent to date
Utilization
73.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹69 Cr
Budget left
Budget Utilization
73.7%Spent
₹194 Cr
Remaining
₹69 Cr
Total
₹263 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/04/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹263 Cr — no cost escalation recorded.
Expenditure stands at ₹194 Cr, which is 73.7% of the revised project cost.
Remaining budget: ₹69 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹263.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation to two lane with paved shoulder configuration of NH-354 Section Ari"?
- Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹263 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹263 Cr has not been significantly revised. Expenditure: ₹194 Cr (73.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Up-gradation to two lane with paved shoulder configuration o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618024. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to two lane with paved shoulder configuration o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.