Roads & HighwaysIPM · Central Project#618024

Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532

Ministry of Road Transport & HighwaysPunjab
Revised Cost: ₹263 CrUtilization: 73.7%

Original Cost

₹263 Cr

Baseline estimate

On budget

Revised Cost

₹263 Cr

Latest approved cost

Expenditure

₹194 Cr

Spent to date

Utilization

73.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹69 Cr

Budget left

Budget Utilization

73.7%
0%25%50%75%100%

Spent

₹194 Cr

Remaining

₹69 Cr

Total

₹263 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

15/04/2025

Revised Completion

30/09/2026

Completed

Project Details

Project Code618024
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StatePunjab
Data Month2026-08

Financial Summary

Original Cost₹263 Cr
Revised Cost₹263 Cr
Expenditure₹194 Cr
Original End Date15/04/2025
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹263 Cr — no cost escalation recorded.

Expenditure stands at ₹194 Cr, which is 73.7% of the revised project cost.

Remaining budget: ₹69 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹263.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation to two lane with paved shoulder configuration of NH-354 Section Ari"?
Up-gradation to two lane with paved shoulder configuration of NH-354 Section Arifkes-Ferozepur-Muktsar-Malaut from Km 201.500 to Km 212.500 & Km 229.690 to Km 269.960 and strengthening of existing pavement from Km 212.500 to Km 229.690 excluding Km 218.500 to 223.690 of NH-354 on EPC Mode in the State of Punjab. Job No. NH-354-PB-2020-21-532 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹263 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹263 Cr has not been significantly revised. Expenditure: ₹194 Cr (73.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Up-gradation to two lane with paved shoulder configuration o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618024. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to two lane with paved shoulder configuration o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.