Roads & HighwaysIPM · Central Project#618766

Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 Savali Vihir to km 163.400 start of Ahmednagar bypass Design Length 75.000 km section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹618 CrUtilization: 52.9%

Original Cost

₹862 Cr

Baseline estimate

On budget

Revised Cost

₹618 Cr

Latest approved cost

Expenditure

₹327 Cr

Spent to date

Utilization

52.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹291 Cr

Budget left

Budget Utilization

52.9%
0%25%50%75%100%

Spent

₹327 Cr

Remaining

₹291 Cr

Total

₹618 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/04/2027

Revised Completion

29/04/2027

Completed

Project Details

Project Code618766
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹862 Cr
Revised Cost₹618 Cr
Expenditure₹327 Cr
Original End Date29/04/2027
Revised Date29/04/2027

Project Intelligence

Project is within original budget of ₹862 Cr — no cost escalation recorded.

Expenditure stands at ₹327 Cr, which is 52.9% of the revised project cost.

Remaining budget: ₹291 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 Savali Vihir to km 163.400 start of Ahmednagar bypass Design Length 75.000 km section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹862.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation to Four Lane with Paved Shoulder configuration of the highway start"?
Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 Savali Vihir to km 163.400 start of Ahmednagar bypass Design Length 75.000 km section of NH-160 in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹862 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹862 Cr and has been revised to ₹618 Cr — a cost overrun of -28.3%. Expenditure to date: ₹327 Cr (52.9% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Up-gradation to Four Lane with Paved Shoulder configuration is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618766. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to Four Lane with Paved Shoulder configuration is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.