Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlrang section of NH 102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-2 Keifang- Tuivai Pkg-2

Ministry of Road Transport & HighwaysMizoram
Revised Cost: ₹524 CrUtilization: 75.2%

Original Cost

₹524 Cr

Baseline estimate

On budget

Revised Cost

₹524 Cr

Latest approved cost

Expenditure

₹394 Cr

Spent to date

Utilization

75.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹130 Cr

Budget left

Budget Utilization

75.2%
0%25%50%75%100%

Spent

₹394 Cr

Remaining

₹130 Cr

Total

₹524 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

22/02/2025

Revised Completion

01/06/2026

Completed

Project Details

Project Code618341
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-05

Financial Summary

Original Cost₹524 Cr
Revised Cost₹524 Cr
Expenditure₹394 Cr
Original End Date22/02/2025
Revised Date01/06/2026

Project Intelligence

Project is within original budget of ₹524 Cr — no cost escalation recorded.

Expenditure stands at ₹394 Cr, which is 75.2% of the revised project cost.

Remaining budget: ₹130 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlrang section of NH 102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-2 Keifang- Tuivai Pkg-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹524.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlrang section of NH 10"?
Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlrang section of NH 102B of Aizawl - Imphal Economic Corridor from Existing Chainage km 32.796 to km 72.030 [Design Chainage km 31.280 to km 68.170] in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-2 Keifang- Tuivai Pkg-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹524 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹524 Cr has not been significantly revised. Expenditure: ₹394 Cr (75.2% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618341. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to 2-lane with paved shoulders of Ngopa - Pawlr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.