Up-gradation to 2 lane with paved shoulder from Neechli Oden Nathdwara at Design Km 88.800 existing km 55.95 to Bhatewar at Design Km 142.028 existing km 0.00 of NH-162E in the State of Rajasthan on EPC mode.
Original Cost
₹607 Cr
Baseline estimate
Revised Cost
₹607 Cr
Latest approved cost
Expenditure
₹256 Cr
Spent to date
Utilization
42.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹351 Cr
Budget left
Budget Utilization
42.2%Spent
₹256 Cr
Remaining
₹351 Cr
Total
₹607 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/10/2026
Revised Completion
03/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹607 Cr — no cost escalation recorded.
Expenditure stands at ₹256 Cr, which is 42.2% of the revised project cost.
Remaining budget: ₹351 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation to 2 lane with paved shoulder from Neechli Oden Nathdwara at Design Km 88.800 existing km 55.95 to Bhatewar at Design Km 142.028 existing km 0.00 of NH-162E in the State of Rajasthan on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹607.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation to 2 lane with paved shoulder from Neechli Oden Nathdwara at Design"?
- Up-gradation to 2 lane with paved shoulder from Neechli Oden Nathdwara at Design Km 88.800 existing km 55.95 to Bhatewar at Design Km 142.028 existing km 0.00 of NH-162E in the State of Rajasthan on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹607 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹607 Cr has not been significantly revised. Expenditure: ₹256 Cr (42.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Up-gradation to 2 lane with paved shoulder from Neechli Oden is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618092. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to 2 lane with paved shoulder from Neechli Oden is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.