Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 existing km 150.00 to Neechli Oden Nathdwara at Design ch. Km 88.800 existing km 55.950 of NH-162E on EPC mode.
Original Cost
₹838 Cr
Baseline estimate
Revised Cost
₹838 Cr
Latest approved cost
Expenditure
₹55 Cr
Spent to date
Utilization
6.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹783 Cr
Budget left
Budget Utilization
6.6%Spent
₹55 Cr
Remaining
₹783 Cr
Total
₹838 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
26/09/2025
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹838 Cr — no cost escalation recorded.
Expenditure stands at ₹55 Cr, which is 6.6% of the revised project cost.
Remaining budget: ₹783 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 existing km 150.00 to Neechli Oden Nathdwara at Design ch. Km 88.800 existing km 55.950 of NH-162E on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹838.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 exis"?
- Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 existing km 150.00 to Neechli Oden Nathdwara at Design ch. Km 88.800 existing km 55.950 of NH-162E on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹838 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹838 Cr has not been significantly revised. Expenditure: ₹55 Cr (6.6% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Up-gradation to 2 lane with Paved shoulder from Charbhuja at is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618093. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to 2 lane with Paved shoulder from Charbhuja at is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.