Roads & HighwaysIPM · Central Project#618021

Up-gradation of Pichhore- Dinara section of NH-346 from Km 292.750 to 334.550 to two lane with paved shoulders in the state of Madhya Pradesh on EPC mode

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹426 CrUtilization: 21.2%

Original Cost

₹426 Cr

Baseline estimate

On budget

Revised Cost

₹426 Cr

Latest approved cost

Expenditure

₹90 Cr

Spent to date

Utilization

21.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹336 Cr

Budget left

Budget Utilization

21.2%
0%25%50%75%100%

Spent

₹90 Cr

Remaining

₹336 Cr

Total

₹426 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/06/2027

Revised Completion

02/06/2027

Completed

Project Details

Project Code618021
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹426 Cr
Revised Cost₹426 Cr
Expenditure₹90 Cr
Original End Date02/06/2027
Revised Date02/06/2027

Project Intelligence

Project is within original budget of ₹426 Cr — no cost escalation recorded.

Expenditure stands at ₹90 Cr, which is 21.2% of the revised project cost.

Remaining budget: ₹336 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation of Pichhore- Dinara section of NH-346 from Km 292.750 to 334.550 to two lane with paved shoulders in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹426.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation of Pichhore- Dinara section of NH-346 from Km 292.750 to 334.550 to"?
Up-gradation of Pichhore- Dinara section of NH-346 from Km 292.750 to 334.550 to two lane with paved shoulders in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹426 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹426 Cr has not been significantly revised. Expenditure: ₹90 Cr (21.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Up-gradation of Pichhore- Dinara section of NH-346 from Km 2 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618021. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation of Pichhore- Dinara section of NH-346 from Km 2 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.