Roads & HighwaysIPM · Central Project#619263

Rehabilitation and upgradation of Wardha Salod Hirapur - Pulgaon Section of NH 347A from km 134/283 to Km 159/075 [Design Chainage Km 0000 to Km 24792] to two Lanes with paved shoulder configuration in the state of Maharashtra on EPC mode.

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹253 CrUtilization: 0.0%

Original Cost

₹253 Cr

Baseline estimate

On budget

Revised Cost

₹253 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹253 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹253 Cr

Total

₹253 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2027

Revised Completion

Completed

Project Details

Project Code619263
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹253 Cr
Revised Cost₹253 Cr
Expenditure₹0 Cr
Original End Date31/12/2027
Revised DateN/A

Project Intelligence

Project is within original budget of ₹253 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹253 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and upgradation of Wardha Salod Hirapur - Pulgaon Section of NH 347A from km 134/283 to Km 159/075 [Design Chainage Km 0000 to Km 24792] to two Lanes with paved shoulder configuration in the state of Maharashtra on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹253.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and upgradation of Wardha Salod Hirapur - Pulgaon Section of NH 3"?
Rehabilitation and upgradation of Wardha Salod Hirapur - Pulgaon Section of NH 347A from km 134/283 to Km 159/075 [Design Chainage Km 0000 to Km 24792] to two Lanes with paved shoulder configuration in the state of Maharashtra on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹253 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹253 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and upgradation of Wardha Salod Hirapur - Pul is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619263. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation of Wardha Salod Hirapur - Pul is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.