Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106
Original Cost
₹395 Cr
Baseline estimate
Revised Cost
₹395 Cr
Latest approved cost
Expenditure
₹284 Cr
Spent to date
Utilization
71.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹111 Cr
Budget left
Budget Utilization
71.8%Spent
₹284 Cr
Remaining
₹111 Cr
Total
₹395 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/07/2024
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹395 Cr — no cost escalation recorded.
Expenditure stands at ₹284 Cr, which is 71.8% of the revised project cost.
Remaining budget: ₹111 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹395.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chai"?
- Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹395 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹395 Cr has not been significantly revised. Expenditure: ₹284 Cr (71.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and up-gradation to 2 lane with paved shoulde is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618225. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and up-gradation to 2 lane with paved shoulde is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.