Roads & HighwaysIPM · Central Project#618225

Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹395 CrUtilization: 71.8%

Original Cost

₹395 Cr

Baseline estimate

On budget

Revised Cost

₹395 Cr

Latest approved cost

Expenditure

₹284 Cr

Spent to date

Utilization

71.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹111 Cr

Budget left

Budget Utilization

71.8%
0%25%50%75%100%

Spent

₹284 Cr

Remaining

₹111 Cr

Total

₹395 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

27/07/2024

Revised Completion

31/12/2026

Completed

Project Details

Project Code618225
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹395 Cr
Revised Cost₹395 Cr
Expenditure₹284 Cr
Original End Date27/07/2024
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹395 Cr — no cost escalation recorded.

Expenditure stands at ₹284 Cr, which is 71.8% of the revised project cost.

Remaining budget: ₹111 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹395.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chai"?
Rehabilitation and up-gradation to 2 lane with paved shoulder from existing chainage km 134950 to km 166100 Design chainage km 116980 to km 146700 under 31 TF on Akhnoor-Poonch road NH-144A in the UT of Jammu & Kashmir under Project Sampark BRO on EPC mode Package-VI Job no NH-144A-J&K-2021-22-106 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹395 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹395 Cr has not been significantly revised. Expenditure: ₹284 Cr (71.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and up-gradation to 2 lane with paved shoulde is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618225. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and up-gradation to 2 lane with paved shoulde is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.