Roads & HighwaysIPM · Central Project#618163

Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis.

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹603 CrUtilization: 58.5%

Original Cost

₹809 Cr

Baseline estimate

On budget

Revised Cost

₹603 Cr

Latest approved cost

Expenditure

₹353 Cr

Spent to date

Utilization

58.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹250 Cr

Budget left

Budget Utilization

58.5%
0%25%50%75%100%

Spent

₹353 Cr

Remaining

₹250 Cr

Total

₹603 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

06/12/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618163
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹809 Cr
Revised Cost₹603 Cr
Expenditure₹353 Cr
Original End Date06/12/2025
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹809 Cr — no cost escalation recorded.

Expenditure stands at ₹353 Cr, which is 58.5% of the revised project cost.

Remaining budget: ₹250 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹809.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S Maharajganj"?
Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹809 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹809 Cr and has been revised to ₹603 Cr — a cost overrun of -25.4%. Expenditure to date: ₹353 Cr (58.5% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and Up-gradation from km. 0000 to km.40390 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618163. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation from km. 0000 to km.40390 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.