Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis.
Original Cost
₹809 Cr
Baseline estimate
Revised Cost
₹603 Cr
Latest approved cost
Expenditure
₹353 Cr
Spent to date
Utilization
58.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹250 Cr
Budget left
Budget Utilization
58.5%Spent
₹353 Cr
Remaining
₹250 Cr
Total
₹603 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/12/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹809 Cr — no cost escalation recorded.
Expenditure stands at ₹353 Cr, which is 58.5% of the revised project cost.
Remaining budget: ₹250 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹809.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S Maharajganj"?
- Rehabilitation and Up-gradation from km. 0000 to km.40390 of NH-730S MaharajganjNichloulThuthibari to two lane with paved shoulders in the State of U.P. on Engineering, Procurement & Construction EPC Basis. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹809 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹809 Cr and has been revised to ₹603 Cr — a cost overrun of -25.4%. Expenditure to date: ₹353 Cr (58.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up-gradation from km. 0000 to km.40390 of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618163. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation from km. 0000 to km.40390 of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.