Reconstruction of existing 2 L/IL to 2L with paved shoulder from existing km 52.200 to 92.880 of NH-
Original Cost
₹282 Cr
Baseline estimate
Revised Cost
₹282 Cr
Latest approved cost
Expenditure
₹166 Cr
Spent to date
Utilization
58.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹116 Cr
Budget left
Budget Utilization
58.9%Spent
₹166 Cr
Remaining
₹116 Cr
Total
₹282 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/06/2019
Revised Completion
20/10/2023
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹282 Cr — no cost escalation recorded.
Expenditure stands at ₹166 Cr, which is 58.9% of the revised project cost.
Remaining budget: ₹116 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Reconstruction of existing 2 L/IL to 2L with paved shoulder from existing km 52.200 to 92.880 of NH- is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹282.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Reconstruction of existing 2 L/IL to 2L with paved shoulder from existing km 52."?
- Reconstruction of existing 2 L/IL to 2L with paved shoulder from existing km 52.200 to 92.880 of NH- is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹282 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹282 Cr has not been significantly revised. Expenditure: ₹166 Cr (58.9% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Reconstruction of existing 2 L/IL to 2L with paved shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617970. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Reconstruction of existing 2 L/IL to 2L with paved shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.