Poly Butadiene Rubber plant at Panipat
Original Cost
₹1459 Cr
Baseline estimate
Revised Cost
₹2531 Cr
Latest approved cost
Expenditure
₹1570 Cr
Spent to date
Utilization
62.0%
Of revised budget
Cost Status
+73.5%
+₹1072 Cr increase
Remaining
₹961 Cr
Budget left
Budget Utilization
62.0%Spent
₹1570 Cr
Remaining
₹961 Cr
Total
₹2531 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1459 Cr
Revised Cost
₹2531 Cr
Increase
+₹1072 Cr
Escalation
+73.5%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1072 Cr (73.5%) from the original estimate of ₹1459 Cr.
Expenditure stands at ₹1570 Cr, which is 62.0% of the revised project cost.
Remaining budget: ₹961 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
Poly Butadiene Rubber plant at Panipat is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹1459.00 Cr, later revised to ₹2531.44 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Poly Butadiene Rubber plant at Panipat"?
- Poly Butadiene Rubber plant at Panipat is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Haryana. Original cost: ₹1459 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1459 Cr and has been revised to ₹2531 Cr — a cost overrun of +73.5%. Expenditure to date: ₹1570 Cr (62.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Poly Butadiene Rubber plant at Panipat is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 611917. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Poly Butadiene Rubber plant at Panipat is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.