POL & LOBS Installations with Receipt Pipelines at Rasayani
Original Cost
₹2585 Cr
Baseline estimate
Revised Cost
₹2585 Cr
Latest approved cost
Expenditure
₹1566 Cr
Spent to date
Utilization
60.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1019 Cr
Budget left
Budget Utilization
60.6%Spent
₹1566 Cr
Remaining
₹1019 Cr
Total
₹2585 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/05/2026
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2585 Cr — no cost escalation recorded.
Expenditure stands at ₹1566 Cr, which is 60.6% of the revised project cost.
Remaining budget: ₹1019 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
POL & LOBS Installations with Receipt Pipelines at Rasayani is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹2585.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "POL & LOBS Installations with Receipt Pipelines at Rasayani"?
- POL & LOBS Installations with Receipt Pipelines at Rasayani is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Maharashtra. Original cost: ₹2585 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2585 Cr has not been significantly revised. Expenditure: ₹1566 Cr (60.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- POL & LOBS Installations with Receipt Pipelines at Rasayani is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 709797. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. POL & LOBS Installations with Receipt Pipelines at Rasayani is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.