Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project.
Original Cost
₹24.5K Cr
Baseline estimate
Revised Cost
₹24.5K Cr
Latest approved cost
Expenditure
₹9174 Cr
Spent to date
Utilization
37.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹15.4K Cr
Budget left
Budget Utilization
37.4%Spent
₹9174 Cr
Remaining
₹15.4K Cr
Total
₹24.5K Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
21/06/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Mega infrastructure project worth ₹24.5K Cr — among the largest central projects in West Bengal.
Project is within original budget of ₹24.5K Cr — no cost escalation recorded.
Expenditure stands at ₹9174 Cr, which is 37.4% of the revised project cost.
Remaining budget: ₹15.4K Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Telecommunication. Ministry: Department of Telecommunications.
Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project. is a centrally-funded infrastructure project under Department of Telecommunications, in the Telecommunication sector. The original approved cost is ₹24545.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration"?
- Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project. is a centrally-funded infrastructure project under the Department of Telecommunications, tracked through the Investment Project Monitoring (IPM) system. Sector: Telecommunication. State: West Bengal. Original cost: ₹24545 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹24545 Cr has not been significantly revised. Expenditure: ₹9174 Cr (37.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Planning, Engineering, Supply, Installation, Testing, Commis is under the Department of Telecommunications in the Telecommunication sector. Project code: 709857. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Planning, Engineering, Supply, Installation, Testing, Commis is one of several Bihar projects tracked under the Telecommunication sector on the IPM system.