TelecommunicationIPM · Central Project#709857

Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project.

Department of TelecommunicationsWest Bengal
Revised Cost: ₹24.5K CrUtilization: 37.4%

Original Cost

₹24.5K Cr

Baseline estimate

On budget

Revised Cost

₹24.5K Cr

Latest approved cost

Expenditure

₹9174 Cr

Spent to date

Utilization

37.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹15.4K Cr

Budget left

Budget Utilization

37.4%
0%25%50%75%100%

Spent

₹9174 Cr

Remaining

₹15.4K Cr

Total

₹24.5K Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

21/06/2025

Revised Completion

30/09/2026

Completed

Project Details

Project Code709857
SectorTelecommunication
MinistryDepartment of Telecommunications
StateWest Bengal
Data Month2026-08

Financial Summary

Original Cost₹24.5K Cr
Revised Cost₹24.5K Cr
Expenditure₹9174 Cr
Original End Date21/06/2025
Revised Date30/09/2026

Project Intelligence

Mega infrastructure project worth ₹24.5K Cr — among the largest central projects in West Bengal.

Project is within original budget of ₹24.5K Cr — no cost escalation recorded.

Expenditure stands at ₹9174 Cr, which is 37.4% of the revised project cost.

Remaining budget: ₹15.4K Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Telecommunication. Ministry: Department of Telecommunications.

Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project. is a centrally-funded infrastructure project under Department of Telecommunications, in the Telecommunication sector. The original approved cost is ₹24545.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration"?
Planning, Engineering, Supply, Installation, Testing, Commissioning, Integration & Annual Maintenance of 4G mobile network at 1 Lakh sites on PAN India basis including Mumbai & Delhi LSA on turnkey basis under Phase IX.2 Project. is a centrally-funded infrastructure project under the Department of Telecommunications, tracked through the Investment Project Monitoring (IPM) system. Sector: Telecommunication. State: West Bengal. Original cost: ₹24545 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹24545 Cr has not been significantly revised. Expenditure: ₹9174 Cr (37.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Planning, Engineering, Supply, Installation, Testing, Commis is under the Department of Telecommunications in the Telecommunication sector. Project code: 709857. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Planning, Engineering, Supply, Installation, Testing, Commis is one of several Bihar projects tracked under the Telecommunication sector on the IPM system.